Turbine – Ghana to Italy and back
A 12 ton Gas Turbine generator from the FPSO John Agyekum Kuffour in Ghana needed urgent repair works in Italy.
The OMA Logistics Ghana team arranged the movement of the generator from Takoradi port to Antwerp where it connected by road to its destination in Massa, Italy for the repair works. Once the work was completed OMA arranged the pick up from the shipper’s workshop in Massa to travel by road to Leige airport in Belgium where it was loaded onboard a freighter aircraft to Accra, and onward by road to Takoradi.
Working closely with our excellent network of global partners meant the journey was trouble-free from beginning to end, across several modes of transport in three countries. The generator arrived back safely and on time for the planned maintenance schedule onboard the FPSO.